The roof replacement process: a homeowner's checklist

Published

The short answer

A roof replacement has three parts: a few weeks of planning, a day or two of work, and a few loose ends after. GAF says a shingle roof on an average-sized home can often be replaced in one to two days, though rain, a steep roof or rotten boards can add time.

Most of your decisions come before the crew arrives: comparing quotes, signing a clear contract, and agreeing who gets the permit.

Replacing a roof takes a day or two of noise, and a few weeks of decisions before it. This checklist follows the whole job in order, from the first quote to the warranty paperwork. Print it, tick it off, and keep it with your quotes. If you already have quotes, you can compare your roofing quotes side by side first.

How long it takes

StageRoughly whenWhat happens
Planning4 to 6 weeks beforeQuotes, contract, permit, ordering materials
Delivery1 to 2 days beforeThe dumpster and materials arrive
The workOften 1 to 2 daysOld roof off, new roof on
AfterwardThe days that followWalk-through, inspection, final payment, warranty

The planning and delivery times come from Owens Corning's homeowner guide (Owens Corning, March 26, 2025). The time for the work comes from GAF: an asphalt shingle roof on an average-sized home "can often be completed in one to two days" (GAF, December 22, 2024). GAF lists what can stretch it:

  • rotten plywood under the old shingles, which can add "anywhere from a few hours to an extra day"
  • a steep roof, "generally greater than an 8:12 slope", where crews need safety equipment and work more slowly
  • rain in the forecast, or frost on a cold morning
  • attic ventilation that needs fixing during the job

Step 1: Decide what the roof needs

Step 2: Get more than one written quote

  • The FTC suggests asking people you know and trust for recommendations, and getting "multiple estimates" (FTC, July 2022). One city's homeowner guide says to get at least three bids (City of Tifton, GA and SAFEbuilt, January 2026).
  • Consider only roofers who are licensed and insured. Your state or county government can confirm a license, and you can ask the roofer for proof of insurance.
  • Our guide to what a roofing estimate should include has a part-by-part checklist.

Step 3: Compare them on the same terms

  • Line up the roof size, the price per square and what each price includes. Our compare tool shows the differences and the questions to ask.
  • The FTC says not to "automatically choose the lowest bidder", and to ask for an explanation when estimates are far apart. Our guide to why two quotes for the same roof can be so different works through an example.

Step 4: Read the contract before you sign

There's no need to sign on the spot. The FTC lists pressure for an immediate decision among the things to watch for. It says to ask for a written contract even if your state doesn't require one, and to check that it includes:

  • the contractor's name, address, phone number and license number
  • an estimated start and completion date
  • any promises made in conversation, such as the scope of work and the cost of labor and materials
  • a written statement of your right to cancel within three business days, if you signed it at home or anywhere other than the seller's permanent place of business

Also check:

  • Payment. The FTC says not to pay the full amount up front. Some states limit the down payment. Your state or local consumer protection office can tell you the rule where you live.
  • Plywood. A per-sheet price for any boards that need replacing, and a promise to check with you first.
  • Shingle color. Owens Corning says to finalize your color before materials are ordered.
  • Warranties. Owens Corning suggests knowing, before you sign, whether you or the roofer will register the warranty. Our guide to roof warranties explains the rest.
  • Blank spaces. The FTC says to make sure they're all filled in.

Step 5: Sort out the permit

  • Ask your city or county building department whether you need a permit. Fees are set locally. Published ranges run from $100 to $500 (Fixr, February 4, 2026) and from $100 to $1,400 (HomeAdvisor, June 17, 2026).
  • Ask the roofer to get it. The Tifton guide advises: "Have the contractor apply for the required permits." The FTC lists a contractor asking you to get the permits yourself among the things to watch for.
  • Ask about inspections. In Tifton, the permit holder must call for a final roof inspection, and a mid-roof inspection may be needed. Your town's rules may differ.

Step 6: Get the house ready

A few days before the work, Owens Corning suggests you:

  • plan to park on the street, so cars aren't stuck in the driveway or garage
  • move bikes, planters, garden tools and anything else from around the house
  • ask whether flowers and shrubs will be covered
  • keep pets secured, and agree with the crew about gates
  • leave gates unlocked and clear a path for ladders
  • give your neighbors a few days' notice

Step 7: Installation day

  • The crew takes off the old roof first. Owens Corning calls this "the messiest part of the process". It can be "very noisy", but you can usually stay home.
  • With the boards bare, the crew checks the decking and flashing, then puts down the underlayment, shingles and vents.
  • If boards need replacing, this is when it shows. Ask the roofer to tell you how many sheets, and show you, before replacing them at the per-sheet price in your contract.

Step 8: After the roof is on

  • Walk-through. Owens Corning says the roofer will most likely do a final walk-through and sweep the property for loose nails. If you find more, it suggests asking for "a secondary sweep for nails".
  • Final inspection. Owens Corning says a final roof inspection should check the installation and materials. If you have a permit, the building department may inspect too.
  • Final payment. The FTC says to "never make the final payment until the work is done and you're satisfied with it."
  • Paperwork. Keep the contract, the final invoice and the warranty documents. GAF asks for proof of when the shingles went on and that you owned the home then (GAF warranty). Owens Corning accepts a contractor's invoice as proof of purchase (Owens Corning).
  • Warranty registration. Owens Corning recommends registering online, with the installation date, shingle type, color and number of squares. CertainTeed says registering isn't required, and that not registering doesn't void its warranty (CertainTeed warranty). If your roofer registers an upgraded warranty, ask when you'll get the confirmation.

If a storm brought you here

What your insurance covers is between you and your insurer, and we can't advise on claims. After a storm, the FTC says: "Don't rely on a contractor to tell you what's covered, and never sign your insurance check over to a contractor" (FTC, September 2025). For questions about how claims work where you live, contact your state insurance department. The NAIC lists every state's department.

Questions to ask before you sign

  1. How long will the work take, and what happens if it rains or you find rotten boards?
  2. What is your license number, and can I see proof of insurance?
  3. Who pulls the permit, and which inspections come with it?
  4. When will the dumpster and materials arrive, and where will they go?
  5. If boards need replacing, what's the per-sheet price, and will you show me first?
  6. How will you protect the yard and plants, and will you sweep for nails?
  7. How much is due before work starts, and when is the rest due?
  8. Which warranties come with this job, and who registers them?
  9. Who do I call if there's a problem after the crew leaves?

The checklist

  1. Decide between repair and replacement, and get a planning range.
  2. Get more than one written quote from licensed, insured roofers.
  3. Line up the quotes side by side and ask about the differences.
  4. Read the contract, fill every blank, and agree the payment schedule.
  5. Confirm who pulls the permit and which inspections are needed.
  6. Clear the driveway and yard, secure pets, and tell the neighbors.
  7. On the day, agree any plywood replacement before it happens.
  8. Do the walk-through, the nail sweep and the final inspection.
  9. Make the final payment once the work is done and you're satisfied.
  10. Keep the paperwork and register the warranty.

When you have your quotes, line them up side by side. It's free, with no account and no phone number.

Your next step

Type in two or three quotes. See what's different, what's not listed, and the questions to ask before you sign.

Compare my quotes

Free, no account, no phone number.