Skip to main content
Roofing Journey home
Menu

How we work out our numbers

Every number on Roofing Journey comes from fixed formulas, run in your browser, and one file of published figures, each with its source and the date we read it. No AI makes a number during your visit.

The figures we use

All 9 figures come from published sources. Each one is a range, as its source gives it. We don't make up a figure or estimate one ourselves.

Every figure in our data file (version 0.3.0, last updated November 23, 2026)

How we work out roof size

These are definitions, not assumptions, so they need no source:

  • A square is 100 square feet of roof surface. It's how roofers measure.
  • A sheet of plywood or OSB (the boards under your shingles) is 4 × 8 feet, or 32 square feet.
  • A pitch of 6 in 12 means the roof rises 6 inches for every 12 inches it runs across. Pitch is how steep the roof is.
  • The overhang is how far the roof reaches past the walls, measured flat, as seen from above.

We keep four areas apart, so they can't be mixed up:

  1. Living space: the finished floor area on every floor. This is what people mean by "the size of my house."
  2. Footprint: the ground the roof covers, seen from above, before overhangs.
  3. Roof area: the sloped surface of the roof.
  4. Material ordered: the roof area in squares, plus a waste allowance for cuts and overlaps.

The roof area calculator goes through these steps:

  1. Footprint from living space: living space ÷ the number of stories, plus any garage or covered porch under the same roof. A split-level or one-and-a-half-story house enters its footprint directly.
  2. Add the overhang. With length and width: (length + 2 × overhang) × (width + 2 × overhang). With only the footprint area, we treat it as a square of the same area, which gives the smallest amount the overhang can add, and the tool says so.
  3. Allow for the slope. Roof area = plan area × the pitch factor, where the pitch factor is √(1 + (pitch ÷ 12)²): the length of the slope for each foot it runs across.
  4. Squares = roof area ÷ 100.
  5. Material ordered = squares × (1 + the waste allowance), with the allowance from the data file for your kind of roof.

If you already know the roof area or squares, for example from a roofer's measurement, the tools use your number and skip the estimate. The result says which way the size was found.

If you pick a pitch from the drawings instead of typing one, we work out the area at both ends of that choice, so you get a range:

  • Low slope: 2 to 4 in 12
  • Moderate: 5 to 7 in 12
  • Steep: 8 to 10 in 12
  • Very steep: 11 to 14 in 12

A steeper pitch always gives a larger area, so the lower pitch gives the low end.

Pitch factors, to six decimal places
PitchPitch factor
0 in 121.000000
3 in 121.030776
4 in 121.054093
6 in 121.118034
8 in 121.201850
10 in 121.301708
12 in 121.414214

How we work out a planning range

The cost calculator adds up to four lines, each as a low end and a high end:

  1. The shingle roof, installed: the roof's squares × the installed price per square for the kind of shingle you pick.
  2. Tear-off (removing the old shingles down to the boards): squares × the tear-off price.
  3. Disposal (hauling the old roof away): $500 to $1,500 per job.
  4. Plywood allowance: the number of sheets × the per-sheet price.

The low end adds up every low figure, and the high end every high figure.

  • Prices use the roof's squares, not the material ordered, because the published prices are per square of roof.
  • Tear-off and disposal are included in the installed price. The source of our installed prices says they cover removing the old roof and hauling it away, so the planner adds nothing for them and nothing is counted twice. Some roofers charge for this separately, so the result shows what it would add as a note (tear-off: $50 to $150 per square; disposal: $500 to $1,500 per job), without adding it to the total.
  • Going over the old roof (a layover) removes nothing, so tear-off and disposal add $0. The installed prices assume the old roof comes off, and the result says so.
  • Layers. No source we found gives a price per layer, so the number of layers doesn’t change the tear-off figure. More than one layer is on the list of extras to confirm, with the building code rule that applies.
  • Roof complexity. The planner adds no separate amount for roof complexity. We found no published percentage for how much hips, valleys or dormers add, so the complexity choice (simple, moderate or complex) sets only the waste allowance. Roof shape is on the list of extras to confirm with your roofer.
  • Plywood. The plywood count starts at 0, and you set it. No source we found says how many boards usually need replacing. Each sheet is priced at $70 to $100 per sheet. Only a roofer on the roof can say how many boards need replacing, and only after the old roof is off.
  • No ZIP code. We don't adjust for where you live, because we don't hold local figures we can source.

Replacing one sheet of plywood (the boards under your shingles), $70 to $100 per sheet. Source: Modernize, "Budgeting for Roofing Emergency Repairs", published September 2, 2026, read November 23, 2026. Roofing Journey plans to apply to Modernize's quote network. We have no agreement with Modernize.

Rounding

All the arithmetic runs at full precision. We round only to show a number, and rounding only ever widens a range: low ends round down and high ends round up.

How each kind of number is shown
NumberShown as
Budget linesTo the nearest $10: the low end down, the high end up
Budget totalWorked out from the unrounded lines, then to the nearest $100: the low end down, the high end up
Material orderedRounded up to the next 0.1 square
SquaresTwo decimal places in the steps, one in summaries
Estimated areasTo the nearest 10 square feet. What you typed is shown as you typed it.
Price per square (quote comparison)To the nearest $1

Money always has a $ sign and commas, like $12,400. In sentences a range reads "$X to $Y".

Worked examples

These examples are worked by the same code the tools run, using the figures above. If a figure changes, the examples change with it.

Example 1: from the size of the house

A one-story house with 2,000 square feet of living space, no overhang, a 6 in 12 pitch and a simple roof.

  • Footprint: 2,000 ÷ 1 story = 2,000 sq ft. With no overhang, the plan area is the same.
  • Roof area: 2,000 × 1.118034 (the pitch factor for 6 in 12) = 2,236.07 sq ft, which is 22.36 squares.
  • Material ordered, with the waste allowance for a simple roof (10% to 15%): 22.36 × 1.1 to 22.36 × 1.15, rounded up to 24.6 to 25.8 squares.

Waste allowance, simple roof, 10% to 15%. Source: Owens Corning, "Roof Replacement Costs Explained", published September 6, 2023, read November 23, 2026.

Example 2: from length and width

A footprint of 40 × 30 feet, a 12-inch overhang, an 8 in 12 pitch and a moderate roof.

  • The overhang is 1 foot on every side, so the plan area is (40 + 2) × (30 + 2) = 1,344 sq ft.
  • Roof area: 1,344 × 1.201850 = 1,615.29 sq ft, which is 16.15 squares.
  • Material ordered, with the waste allowance for a moderate roof (10% to 15%): rounded up to 17.8 to 18.6 squares.

Example 3: from the footprint area alone

A footprint of 1,600 square feet, with no length or width, a 12-inch overhang and a 4 in 12 pitch.

  • We treat the footprint as a square of the same area. Its perimeter is 4 × √1,600 = 160 feet. A square has the shortest edge for its area, so this is the smallest amount the overhang can add.
  • Plan area: 1,600 + 160 × 1 + 4 × 1² = 1,764 sq ft. That equals 42 × 42, which checks it.
  • Roof area: 1,764 × 1.054093 = 1,859.42 sq ft, which is 18.59 squares.

Example 4: a planning range with our real figures

Example 1's roof (22.36 squares), with architectural shingles at $400 to $800 per square installed, one layer of old shingles torn off and no plywood count typed. These are the real figures from our data file.

Architectural (dimensional) shingle roof, installed, $400 to $800 per square. Source: Fixr, "How Much Does Asphalt Shingle Roofing Cost? [2026 Data]", published January 21, 2026, read November 23, 2026.

Each line at full precision, then as the planner shows it
LineLow endHigh end
Shingle roof, installed$8,944.27, shown as $8,940$17,888.54, shown as $17,890
Tear-off (removing the old roof)Included ($0). If charged separately: $1,110Included ($0). If charged separately: $3,360
Disposal (hauling it away)Included ($0). If charged separately: $500Included ($0). If charged separately: $1,500
Plywood allowance$0$0
Total$8,944.27, shown as $8,900$17,888.54, shown as $17,900

The planning range is $8,900 to $17,900. The total is worked out from the unrounded lines, then rounded to the nearest $100: the low end down and the high end up.

With 10 sheets of plywood typed, the plywood line adds 10 × $70 to 10 × $100, which is $700 to $1,000.

Removing the old roof and hauling it away, when a roofer charges for it separately, $50 to $150 per square. Source: Fixr, "How Much Does Asphalt Shingle Roofing Cost? [2026 Data]", published January 21, 2026, read November 23, 2026.

Hauling away and disposing of the old roof, when charged separately, $500 to $1,500 per job. Source: HomeAdvisor, "How Much Does Roof Replacement Cost?", published June 17, 2026, read November 23, 2026.

Replacing one sheet of plywood (the boards under your shingles), $70 to $100 per sheet. Source: Modernize, "Budgeting for Roofing Emergency Repairs", published September 2, 2026, read November 23, 2026. Roofing Journey plans to apply to Modernize's quote network. We have no agreement with Modernize.

How the quote comparison works

  • Price per square: each quote's total ÷ that quote's own square count (its squares, or its roof area ÷ 100), to the nearest $1. If the square counts differ, the per-square figures aren't on the same terms either, and the page says so.
  • Each item gets a status in words: "Not listed" when a quote doesn't mention it, "Different" when every quote mentions it with different answers, and "Listed on all quotes" when they match. Typed text is compared ignoring capitals, spacing and punctuation.
  • Each difference or gap becomes a plain statement and the exact question to ask the roofer. The same rules run whatever order you type the quotes in.
  • Square counts more than 10% apart get their own note. That 10% is our own tool setting for when it's worth asking how each roofer measured, not an industry rule. A roofing professional hasn’t checked it yet; it’s on the list for the review below.
  • What the comparison never does: call a quote good or bad, give it a score, or sort quotes by price. Quotes stay in the order you typed them.

Why do cost guides disagree?

Cost guides often give very different totals for a new roof. Mostly that's because they measure different things: every roof material or only shingles, what customers say they paid or what pricing databases say, with or without tearing off the old roof, or one fully specified job. Here's what each published figure we found measures:

We don't average these or use them in the planner. The planner prices your roof per square, from the figures in the table above, so you can see exactly what it assumes.

How shingle prices have moved

Producer prices for asphalt shingle and coating materials were 3.2% higher in October 2026 than in October 2025, and 45% higher than in January 2020. This index tracks prices manufacturers receive, not what homeowners pay installed. Recent months can be revised.

This is context only. We never use it to adjust a figure.

Source: U.S. Bureau of Labor Statistics, Producer Price Index by Industry: Asphalt Shingle and Coating Materials Manufacturing (PCU324122324122), via FRED, published November 13, 2026, read November 23, 2026.

Building code references

These rules come from the International Residential Code (IRC). Your city or county decides which edition applies and may change it, so check with your local building department.

IRC R905.2.2

Asphalt shingles shall be used only on roof slopes of 2 units vertical in 12 units horizontal (17-percent slope) or greater. For roof slopes from 2 units vertical in 12 units horizontal (17-percent slope) up to 4 units vertical in 12 units horizontal (33-percent slope), double underlayment application is required in accordance with Section R905.1.1.

Edition: 2024 IRC (same wording in the 2021 IRC).

Source: International Code Council, 2024 International Residential Code, R905.2.2 Slope, no publication date given, read November 23, 2026.

Also: City of Tifton, GA / SAFEbuilt, "2024 IRC Residential Re-Roof" homeowner building guide, published January 1, 2026, read November 23, 2026.

That's why the roof area calculator asks you to check a pitch below 2 in 12.

More than one layer of old shingles

Removing two or more layers takes longer and makes more debris. Building codes based on the IRC don't allow a new roof over a roof that already has two or more layers.

IRC R908.3.1.1: new roof coverings shall not be installed without first removing existing coverings 'where the existing roof has two or more applications of any type of roof covering' (local adoption varies)

Source: City of Tifton, GA / SAFEbuilt, "2024 IRC Residential Re-Roof" homeowner building guide, published January 1, 2026, read November 23, 2026.

What we can't know

  • Only a roofer on the roof can say how many boards need replacing, and only after the old roof is off.
  • A planning range isn't a price. Local prices, the roof's condition and the roofer's own costs all change what a quote says.
  • When the roof size is worked out from the size of the house, the real roof can differ, especially on houses with several levels, dormers or wide overhangs. A roofer's measurement replaces the estimate.
  • We don't hold local prices, so we can't say how prices where you live compare.

Figures last updated

Figures last updated November 23, 2026 (data file version 0.3.0). The tools read the same file, so a change shows up in every tool and on this page at the same time.

To go back to your planning range, use your browser's Back button. What you typed is kept in that page's address.

Review by a roofing professional

No roofing professional has reviewed our formulas and figures yet. When one does, we'll name them here, with their credential and the date of the review. Until then, read every planning range as our own working from published figures.

We'll ask them to check:

  • the pitch factors and how we add the overhang
  • the drawn pitch choices
  • the waste allowance for each kind of roof
  • what we mean by a simple, moderate or complex roof
  • the line we use for square counts that differ in the quote comparison
  • the comparison items and the wording of each question
  • the plain explanations of trade terms
  • whether anything a homeowner should confirm is missing from our extras to confirm

If you think a figure or source is wrong or out of date, tell us.

Back to the tools